{"id":1181,"date":"2021-02-17T00:00:00","date_gmt":"2021-02-17T00:00:00","guid":{"rendered":"https:\/\/uomosul.edu.iq\/en\/engineering\/2021\/02\/17\/a-field-visit-to-al-muthana-bridge\/"},"modified":"2021-02-17T00:00:00","modified_gmt":"2021-02-17T00:00:00","slug":"a-field-visit-to-al-muthana-bridge","status":"publish","type":"post","link":"https:\/\/uomosul.edu.iq\/en\/engineering\/2021\/02\/17\/a-field-visit-to-al-muthana-bridge\/","title":{"rendered":"A Field Visit to Al-Muthana Bridge"},"content":{"rendered":"<p>Within the framework of the field work and enhancing the practical side for Department of Dams and Water Resources Engineering&#8217;s students at College of Engineering,the department Lecturers accompanied 4th stage students on Wednesday 17\/2\/2021to Al-Muthanna Bridge toseethe work in the bridge&#8217;ssewers network, drilling operations, laying pipes, etc. Among the matters related to the site, in cooperation with NinevehSewage Directorate, where the Directorate&#8217;s engineers gave a practical explanation of the work process and the current completion ratio after giving students a complete idea about the project.<img class=\"lazyload\" decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271024%27%20height%3D%27768%27%20viewBox%3D%270%200%201024%20768%27%3E%3Crect%20width%3D%271024%27%20height%3D%27768%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/20210218_023030_420.jpg\" \/><img class=\"lazyload\" decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271024%27%20height%3D%27767%27%20viewBox%3D%270%200%201024%20767%27%3E%3Crect%20width%3D%271024%27%20height%3D%27767%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/20210218_023034_420.jpg\" \/><img class=\"lazyload\" decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271024%27%20height%3D%27897%27%20viewBox%3D%270%200%201024%20897%27%3E%3Crect%20width%3D%271024%27%20height%3D%27897%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/20210218_023043_400.png\" \/><img class=\"lazyload\" decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271024%27%20height%3D%271365%27%20viewBox%3D%270%200%201024%201365%27%3E%3Crect%20width%3D%271024%27%20height%3D%271365%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/20210218_023056_420.png\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Within the framework of the field work and enhancing the practical side for Department of Dams and Water Resources Engineering&#8217;s students at College of Engineering,the department Lecturers accompanied 4th stage students on Wednesday 17\/2\/2021to Al-Muthanna Bridge toseethe work in the bridge&#8217;ssewers network, drilling operations, laying pipes, etc. Among the matters related to the site, in cooperation with NinevehSewage Directorate, where the Directorate&#8217;s engineers gave a practical explanation of the work process and the current completion ratio after giving students a complete idea about the project.<\/p>\n","protected":false},"author":1,"featured_media":1182,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts\/1181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/comments?post=1181"}],"version-history":[{"count":0,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts\/1181\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/media\/1182"}],"wp:attachment":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/media?parent=1181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/categories?post=1181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/tags?post=1181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}