{"id":286,"date":"2014-05-05T00:00:00","date_gmt":"2014-05-05T00:00:00","guid":{"rendered":"https:\/\/uomosul.edu.iq\/en\/engineering\/2014\/05\/05\/the-general-committee-in-the-dams-and-water-resources-engineering-department-has-its-fourth-regular-meeting\/"},"modified":"2014-05-05T00:00:00","modified_gmt":"2014-05-05T00:00:00","slug":"the-general-committee-in-the-dams-and-water-resources-engineering-department-has-its-fourth-regular-meeting","status":"publish","type":"post","link":"https:\/\/uomosul.edu.iq\/en\/engineering\/2014\/05\/05\/the-general-committee-in-the-dams-and-water-resources-engineering-department-has-its-fourth-regular-meeting\/","title":{"rendered":"The general committee in the Dams and Water Resources Engineering Department has its fourth regular meeting"},"content":{"rendered":"<p>The general committee in the Dams and Water Resources Engineering Department has its fourth regular meeting in the year 2013-2014 on Sunday , 4th of May . The committee was discussed the following issues  Preparing for final exams-  Presenting the instructions of how to fill the form required by ABET &#8211; <img class=\"lazyload\" decoding=\"async\" alt=\"\u063a\u063a\u063a\u063a\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27427%27%20viewBox%3D%270%200%20700%20427%27%3E%3Crect%20width%3D%27700%27%20height%3D%27427%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/oldUo_20190816_030216_67_516.jpg\" style=\"width: 600px; height: 366px;\" \/><img class=\"lazyload\" decoding=\"async\" alt=\"\u0639\u0639\u0639\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27373%27%20height%3D%27256%27%20viewBox%3D%270%200%20373%20256%27%3E%3Crect%20width%3D%27373%27%20height%3D%27256%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-content\/uploads\/sites\/7\/2023\/03\/oldUo_20190816_030216_74_517.png\" style=\"width: 300px; height: 206px;\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The general committee in the Dams and Water Resources Engineering Department has its fourth regular meeting in the year 2013-2014 on Sunday , 4th of May . The committee was discussed the following issues Preparing for final exams- Presenting the instructions of how to fill the form required by ABET &#8211;<\/p>\n","protected":false},"author":1,"featured_media":287,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-286","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts\/286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/comments?post=286"}],"version-history":[{"count":0,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/posts\/286\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/media\/287"}],"wp:attachment":[{"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/media?parent=286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/categories?post=286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uomosul.edu.iq\/en\/engineering\/wp-json\/wp\/v2\/tags?post=286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}