29 December، 2021

The Process of Pouring the Second Floor of Building the Scientific Departments 2 of the College of Medicine under Construction (Right Side)

The process of pouring the second floor of the building of the scientific departments 2 of the College of Medicine under construction (right side) was completed on Saturday 25th December 2021. The pouring procedures started since the early morning and continued for long hours under the supervision of the resident engineer of the project of the Department of Construction and Projects of University Presidency and with the follow-up from the deanship of the college.

The Deanship of the College of Medicine Meets with the Admitted Students for the Academic Year 2021-2022
A Master's Thesis Dealing with the Histological Effects of Neonatal Exposure to Ibuprofen and Paracetamol on Rat Brains

Share