20 December، 2021

A Sustainable Follow-up to the Laboratories of the College of Medicine (under construction) on the Right Side

The College of Medicine continues its sustainable follow-up to the college laboratories (under construction) on the right side. On Tuesday, 14th December 2021, the college authorized visitor to the laboratory construction site (in charge of the Medical Education Unit), the Assistant Lecturer, Karam T. Tawfiq to follow up on its construction.

The visit included a meeting with the engineers of the first, second and third building sites as well as with the implementing contractors. The college (through its authorized representative) stressed the need to follow the standard specifications for implementing nationally and internationally accredited laboratories. Various stages of construction were also reviewed.

Share

Share